Costs Management
1. Using the schedule from the charts and tables provided and at the end of the report, estimate the cost for each activity
2. Determine the total budgeted cost for the project
3. Prepare a budgeted cost by period table (similar to Figure 7.5 on Page 250) and a
cumulative budgeted cost (CBC) curve (similar to Figure 7.6 on Page 250) for the
project.