Your book talks about the “Scope Triangle” or the Iron Triangle.  Question 1: Yo

Your book talks about the “Scope Triangle” or the Iron Triangle. 
Question 1: Your book addresses six areas that are part of the iron triangle – 
Describe each of the areas included in the iron triangle
Of the six which areas do you feel are the most important and why? 
Question 2: You are managing a project and your sponsor has given the following constraints:
The project must be completed in 2 months
The project must include 7 core pieces of scope
The project must stay within 1 million dollars
What concerns do you have with the three constraints above and how do you proceed?Part 2Scope Creep – Discuss ways in which scope creep occurred on projects with which you have been associated.  Was the project manager able to reverse scope creep? Is it possible to reverse scope creep and what is the impact? How do you identify scope creep?Assignment Requirements:. 
This is to be in narrative form and should be as thorough as possible.
Bullet points should not be used. 
The paper should be at least 1.5 – 2 pages in length.
Times New Roman 12-pt font, double-spaced, 1-inch margins
Utilizing at least one outside scholarly or professional source related to project management. The textbook should also be utilized.
Do not insert excess line spacing.
APA formatting and citation should be used.

The post Your book talks about the “Scope Triangle” or the Iron Triangle. 
Question 1: Yo appeared first on Assignmentio.

Reference no: EM132069492

WhatsApp
Hello! Need help with your assignments? We are here

GRAB 25% OFF YOUR ORDERS TODAY

X