Calculate the work done if the force increases from 100N to 700N using: Take the number of cut sections to be 5. i) An analytical integration technique ii) A numerical integration technique Compare th

Task 1

  • Calculate the work done if the force increases from 100N to 700N using: Take the number of cut sections to be 5.
    i) An analytical integration technique
    ii) A numerical integration technique
  • Compare the two answers
  • Using a computer spreadsheet increase the number of values used for your numerical method
  • Analyze any effect the size of the numerical step has on the result.

Task 2

  • Find the indefinite integral of the function

BTEC Engineering

  • Calculate the definite integral

BTEC Engineering

Task 3

An object is moving with a uniform acceleration a = 3ms‾², determine the functions for:

  • Velocity (ms‾¹) – given v(0) = 12ms‾¹
  • Displacement s(m) – given s(0) = 7m
  • Calculate the values of v and s for:
    i) t = 3s
    ii) t =7s

 

Reference no: EM132069492

WhatsApp
Hello! Need help with your assignments? We are here

GRAB 25% OFF YOUR ORDERS TODAY

X