You are a Project Manager employed by Anywhere Borough Council (the Client) to project manage the delivery of a new leisure centre located in Ballyhermit, Northern Ireland (“the Project”). The main contractor is Kingsmount Construction Limited (“the Contractor”). An NEC4 Engineering and

Assignment Task

Scenario

You are a Project Manager employed by Anywhere Borough Council (the Client) to project manage the delivery of a new leisure centre located in Ballyhermit, Northern Ireland (“the Project”). The main contractor is Kingsmount Construction Limited (“the Contractor”). An NEC4 Engineering and Construction Contract Option A is in place between the Client and the Contractor. Relevant extracts from the contract are appended to this document.

On 25 January 2022, you received a letter from the Contractor’s lawyers. The letter gives particulars of a dispute which has formed between the Contractor and the Client with respect to adverse physical conditions on the site in which the Project is being constructed. A copy of the letter is appended to this document.

The Employer has asked you to provide a report on what options are available to it in terms of dispute resolution. In your report, you should detail the following:

  • An overview of the situation;
  • Has a dispute crystalised? If so, why?
  • Dispute resolutions options available to the Employer, including:
    • Negotiation
    • Mediation
    • Adjudication
    • Arbitration
    • Litigation
  • With respect to each dispute resolution option, give the Employer has asked for an overview of what each option will require if it, what the pros/cons are of each option and a brief description of the procedure associated with each option.
  • A concluding recommendation on what strategy should be adopted by the Employer (hint – this might include using several dispute resolution options).

 