BPM209 Tutor-Marked Assignment One ( TMA01) SUSS : July 2024 – Cost Management for C&S Works

QUESTIONS

Question 1

Identify and briefly describe any THREE (3) responsibilities of the Consultant Quantity Surveyor during each of the following stages of a construction project.

(a) Feasibility and design 

(b) Tender documentation and tender award 

(c) Post contract work 

Question 2

(a) Identify and explain with the help of diagrams the CEMS rules required to be applied to the measurement of oversite excavation and the subsequent disposal of the excavated materials off site.

(b) Interpret Figures Q2.1 and Q2.2 and take-off quantities for the oversite excavation and disposal of excavated materials off site.

Specifications:
1. The existing ground level is at 20.100.
2. All excavated materials shall be disposed off site to an approved tip

Write My Assignment
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments

Native Singapore Writers Team

100% Plagiarism-Free Essay
Highest Satisfaction Rate
Free Revision
On-Time Delivery

Question 3

Apply measurement techniques and interpret the scope of C & S work with reference to Figures Q3.1 to Q3.3 to prepare a take-off list with associated CEMS clauses and the units of measurement for the following works:

(a) Excavation, concrete and formwork for the pile caps and column stumps including the adjustment of quantities for excavation work.

(b) Reinforcement for pile caps & column stump

(c) Precast reinforced concrete piles.

Question 4

Apply measurement techniques and interpret the scope of C & S work with reference to Figures Q3.1 to Q3.3 to take-off quantities for the following works:

(a) Excavation, concrete and formwork for the pile caps and column stumps including the adjustment of quantities for excavation work.

(b) Reinforcement for pile caps and column stump.

(c) Precast reinforced concrete

working piles

Figure Q2.1 – Foundation Plan (NTS)

Figure Q2.2 – Section Through Slab (NTS)

Figure Q3.1 – Foundation & Piling Plan (NTS)

Figure Q3.2 – Pilecap Details (NTS)

Figure Q3.3 – Pilecap Reinforcement Details (NTS)

Stuck with a lot of homework assignments and feeling stressed ?
Take professional academic assistance & Get 100% Plagiarism free papers
Get A Free Quote

The post BPM209 Tutor-Marked Assignment One ( TMA01) SUSS : July 2024 – Cost Management for C&S Works appeared first on Singapore Assignment Help.

Reference no: EM132069492